• Reference
    • GB 59 Kodak A1491
  • Dates of Creation
    • 1927
  • Language of Material
    • English
  • Physical Description
    • 1 folder: Typescript Condition: Good

Scope and Content

Memorandum on Cost of Construction of the 6th Floor, 25 March 1927; correspondence with Concrete Limited regarding an additional payment. The total cost of the Kingsway extension was £17,963. Subject(s): Premises; Kingsway.

Access Information

Not Public Record(s)

Unrestricted. Appointment Required to view these records. Please consult Asian and African Studies Print Room staff.