This study states the parameters and assumptions on which the 'optimised designs' for the South West-North East Metro are based.
South West-North East Metro Chelsea-Hackney Line Base Assumptions report
This material is held atTransport for London Corporate Archives
- Reference
- GB 2856 (NEW)LT000253/077
- Former Reference
- GB 2856 a/c337/021 LT000253/058
- Dates of Creation
- 3 Oct 1994
- Language of Material
- English
- Physical Description
- 1 folder(s)
- Location
- TFL000371
Scope and Content
Access Information
Closed
04/10/2014
Closed for standard 20 years